Black Friday Deal Flat 50% OFFon all 12 themeson all 12 themeson 12 themes
12 eCommerce ThemesOne nopCommerce Bundle

Offer ends in06Days08Hrs55Min36Sec
Explore Black Friday OfferExplore OfferExplore →

nopCommerce Upgrade Service: What a 4.x to 5.0 Upgrade Includes and Costs

Migration & upgrades 9 min read

nopCommerce Upgrade Service: What a 4.x to 5.0 Upgrade Includes and Costs

What you are paying for when you hand a nopCommerce upgrade to a partner, what makes one upgrade cost more than another, how the project runs from audit to go-live, and what to ask before you sign.

The nopCommerce 4.90.0 and 5.00.1 release pages on GitHub, before and after, beside the words Upgrading to 5.0

Key takeaways

  • An upgrade service covers more than new files: a backup you have restored once, a rehearsal on a copy, plugin and theme fixes, testing and a planned go-live with a way back.
  • nopCommerce 4.80 and 4.90 run on .NET 9, which lost support on 10 November 2026. nopCommerce 5.00.1 runs on .NET 10, supported until 14 November 2028.
  • The cost depends on five things: how old your version is, how many plugins you run, how much custom code and theme work you have, your integrations, and your data and hosting.
  • Ask for a written audit before a fixed quote. A price given before anyone has looked at your plugins leaves the risky parts unpriced.

Your store runs nopCommerce 4.70, it takes orders every day, and the admin dashboard has been showing a new release for months. Someone on the team asks what an upgrade would cost, and nobody can answer, because nobody knows what the upgrade would touch.

We run nopCommerce upgrades for store owners, so we get this question in exactly that form. The price depends on what your store runs: its plugins, its theme, its custom code and its integrations. Someone has to look at those before anyone can name a figure.

This guide explains what an upgrade service should include, why stores on 4.x are moving to 5.0 now, what drives the cost, how the project runs and what to ask before you hire someone. If you plan to do it yourself, our step-by-step 4.90 to 5.0 guide covers the technical steps.

What a nopCommerce Upgrade Service Includes

The official Upgrading nopCommerce page on GitHub with four numbered steps: back up everything, keep the App_Data JSON files, upload the new files, test before go-live

nopCommerce does not upgrade itself. The official upgrade chapter says so in its first paragraph, and its steps are short: back up everything, remove the old files except the JSON files in App_Data, upload the new release and check that the store works.

Since 4.40 the database is updated by migrations that run on the first start, so there are no SQL scripts to run by hand.

Those steps describe a store with no plugins, no theme changes and no integrations. A real store has all three, and that is the work a service is for. A complete upgrade covers these parts:

  • An audit. A list of every plugin, theme, customisation and integration, with a note on whether each has a version for the target release.
  • A tested backup. The database, the site files, the App_Data JSON files and the images folder, restored once to prove the backup works.
  • A rehearsal on a copy. The upgrade runs first on a copy of the live store, so the migrations meet your real data before your customers do.
  • Plugin and theme work. Vendor plugins updated, custom plugins ported, the theme brought up to the new release.
  • Testing. Checkout, payments, shipping, email and admin tasks, run end to end.
  • Go-live and rollback. A planned window on the live store, with the backup ready if anything goes wrong.

If a quote leaves out the rehearsal or the rollback plan, you are buying the file copy and keeping the risk yourself.

Planning a move to nopCommerce 5.0? BSS audits, rehearses and runs nopCommerce upgrades.

See upgrade services

Why Stores on 4.x Are Upgrading to 5.0 Now

Microsoft's .NET support policy tables, labelled .NET 10 supported to November 2028 and .NET 9 ended November 2026

nopCommerce sits directly on Microsoft's .NET runtime, so the runtime's support dates become your store's. nopCommerce 4.70 runs on .NET 8, and 4.80 and 4.90 run on .NET 9. Both .NET 8 and .NET 9 reached the end of support on 10 November 2026, which means no more security fixes for the runtime under those stores.

nopCommerce 5.00.1, released on 9 November 2026, runs on .NET 10. That is a long-term support release, and Microsoft supports it until 14 November 2028. A store upgraded now gets two years on a supported runtime before the next move has to be planned.

The store will not stop working on the day support ends. It just keeps running on a base that no longer gets patched, and the longer it waits, the bigger the gap between your version and the current one becomes. Our post on .NET 8 and 9 end of support explains what that means in practice.

From the BSS team

The upgrades we run cost least when the store's own plugins have been kept current between releases. The most common surprise we find is a plugin that has not been touched for two versions and no longer loads. Our maintenance and support work keeps them current between upgrades.

What Drives the Cost of an Upgrade

A nopCommerce 5.00 plugin.json file on GitHub with SupportedVersions set to 5.00, under the words every plugin must declare 5.00

Two stores on the same version can need very different amounts of work. These are the five things that set the price, roughly in the order they matter.

  1. How far back you are. A store on 4.40 or later moves forward through migrations. A store on 4.30 or earlier has to run SQL upgrade scripts one version at a time first, and a store on 3.90 has to install 4.00 before anything else. Each step is another rehearsal.
  2. How many plugins you run. Every plugin declares the versions it supports in its plugin.json file. A vendor plugin needs a build for 5.00; if the vendor has not released one, someone has to port it or replace it.
  3. Custom code and theme work. Plugins written for your store are ported by hand, and a theme with heavy changes is checked view by view. This is usually the largest line in the estimate.
  4. Integrations. ERP, payment, shipping and accounting connections have to be tested against the new release, often with the other system's sandbox.
  5. Data and hosting. A large database takes longer to migrate on the first start, and a server that only has .NET 9 needs the .NET 10 runtime before 5.0 will run on it.
BSS theme for this step

VoltFitness Theme + 18 Plugins for nopCommerce

If your current theme is too heavily changed to bring forward, a theme built for both 4.90 and 5.00 lets you upgrade first and restyle on a supported base.

A version jump with three vendor plugins and a stock theme is a small job. A 4.50 store with custom checkout logic, an ERP sync and a reworked theme is a project. Our plugin and theme compatibility guide shows how to check your own list before you ask for quotes.

How an Upgrade Project Runs

A line from the nopCommerce documentation, make a backup of everything on your site, beside the 5.00.1 release packages on GitHub, labelled rehearse on a copy first and go live with the backup ready

A well-run upgrade follows the same order every time, whoever does it. The steps are what keep a bad surprise on the copy instead of the live store.

  1. Audit and quote. The partner reads your plugin list, theme and integrations and gives you a written scope. A fixed price makes sense only after this step.
  2. Backup and copy. The live store is backed up, the backup is restored once to prove it works, and a copy is set up for the rehearsal.
  3. Rehearsal. The new release goes onto the copy, the migrations run against your real data, and the startup log is read line by line.
  4. Fixes. Plugins are updated or ported and the theme is brought up to date, all on the copy.
  5. Testing. A full order goes through checkout, payment, shipping and email, and your team checks the admin tasks they use every day.
  6. Go-live. In an agreed window, admin changes are frozen, a fresh backup is taken and the same steps run on the live store.
  7. Aftercare. Someone watches the store for errors in the days after, with the rollback still possible.

If the new version misbehaves, the official advice is to restore the backup and put back the previous version's files. That only works if the backup was tested in step two.

From the BSS team

When we run an upgrade, the first start on the copy is the step we watch most closely, because that is when the migrations meet your data. If you would rather not run it yourself, our team handles nopCommerce version upgrades from audit to aftercare.

What to Ask Before You Hire an Upgrade Partner

The BSS eCommerce development page on a desktop and a phone, under the words ask before you hire

Most upgrade problems trace back to a scope nobody wrote down. These questions bring that scope out before you sign.

Questions for any upgrade partner

  • Will you audit our plugins, theme and integrations before you give a fixed price?
  • Which of our plugins have a 5.00 version, and what happens to the ones that do not?
  • Where will the rehearsal run, and will we be able to test on that copy ourselves?
  • What does the rollback plan include, and has the backup been restored once?
  • Who watches the store after go-live, and for how long?
  • Do you keep our URLs and redirects unchanged so search traffic is not lost?

Written answers to these give you a scope you can hold a partner to. A single number offered before anyone has seen the store leaves the risky parts unpriced.

BSS is an Official nopCommerce Partner and builds nopCommerce plugins and themes, so the plugin work in an upgrade is the work we do every day. If the work that follows needs a developer too, you can hire a .NET developer from our team by the project or full-time.

Frequently Asked Questions

How much does a nopCommerce upgrade cost?
It depends on your version, your plugins, your custom code and theme, your integrations and your data. A stock store with a few vendor plugins is a small job; a store with custom plugins and an ERP sync is a project. Ask for a written audit first, then a fixed quote.
Does nopCommerce upgrade automatically?
No. You replace the files by hand, keeping the JSON files in App_Data. Since 4.40 the database part runs automatically through migrations on the first start, so no SQL scripts are needed.
Can I upgrade from an old version straight to 5.0?
A store on 4.40 or later moves forward through migrations. A store on 4.30 or earlier runs the SQL upgrade scripts one version at a time first, and a store on 3.90 installs 4.00 before anything else. Rehearse every step on a copy.
Will my plugins work after the upgrade?
Only plugins with a build for the new version. Each plugin lists its supported versions in plugin.json. Plugins built for 5.00 work on both 5.00.0 and 5.00.1, according to the 5.00.1 release notes.
What happens if the upgrade fails?
You restore the database backup and put back the previous version's files, keeping the same JSON files and images folder. That is why the backup should be restored once before the upgrade starts.

Final Thoughts

Back to the store on 4.70. Its owner asks for an audit first and gets a list: eight plugins, two of them custom, a theme with checkout changes, and a shipping integration. Five plugins already have 5.00 builds, the two custom ones need porting and one will be replaced.

With that list the quote covers named work, and the upgrade runs on a copy before it touches a single order. The store ends up on a supported runtime, and go-live day holds no surprises.

MH

Written by Moumita Hossain

Software Engineer · Bangladesh Software Solution

Software Engineer at BSS in Dhaka, building backend systems in JavaScript and TypeScript.

Read nextMigration & upgrades Upgrading nopCommerce 4.90 to nopCommerce 5.0: A Step-by-Step Guide 9 min read